FIRST WITNESS STATEMENT OF STEPHEN PARKER
I, Stephen Parker, will say as follows...
Career History
1. lam a former employee of Fujitsu and held the position Head of Post Office
Application Support. This witness statement is made to assist the Post Office
Horizon IT Inquiry (the “Inquiry”) with the matters set out in the Rule 9 Request
dated 11th January 2023 (the “Request”)
2. I started working within the IT industry at the age of 16 as a computer operator
for a company providing IT services to Lloyds of London. I later moved into a
system support role within this company until I joined ICL in 1985. Prior to my
work on the Post Office account, I held a number of roles within ICL, including
in-house operations and support roles for online systems, support consultancy
services and design and development roles using Microsoft tools.
Page 1 of 39
3.
WITNO0680100
WITNO00680100
I have no academic qualifications beyond secondary school. I have received
industry specific technical and skills training. These included programming
languages and methodologies, database systems, support techniques and
management skills training. Having worked for the same company for many
years and now being retired I have not maintained a CV for some time so do
not have a list of training with that I can reproduce here.
I began working in July 1997 as a support consultant within the Software
Support Centre (SSC) for the Pathway project (later Post Office Account (POA)
and Royal Mail Group Account (RMGA)), providing third line application
support for the Horizon application.
My technical role specialised in the support of data centre systems. Within this
role I also developed some of the support tools used by the SSC and was for a
few years the lead designer and part of development team for the SSC
Website.
In addition to my technical role I also assisted the SSC manager (Mik Peach) in
the provision of the support service and its operational management. Although
this role never carried a formal title I effectively acted as the deputy manager to
the SSC.
Between December 2009 and March 2010 I was a full time Problem Manager /
Operational Manager of the SSC, responsible for the management of incidents
through the whole support process.
Page 2 of 39
10.
11.
WITNO0680100
WITNO00680100
In March 2010 I became the Manager of the SSC and was responsible for the
provision of third line application support to the Post Office Account, including
the management of the staff working on the account. The SSC subsequently
expanded to provide support services to a number of Fujitsu customers
(described as “shared service”), the largest of which was still the Post Office
Horizon system. As head of this unit I was responsible for strategic support for
4 customers and the management of 25-40 staff.
I accepted voluntary redundancy from Fujitsu and retired in December 2019.
In total I supported and developed IT systems for 43 years.
On leaving Fujitsu I did not retain any documentary information relating to the
business. The information here relies on my memory and any documents
supplied by the inquiry. While I do not have a good memory for dates or
figures, I help here as much as I can.
Horizon Support Structure
12.
The Horizon system had a multi level support structure which is common within
the industry. Generally, as you move up through the levels of support the cost
of the staff providing the service increases because they are more skilled and
experienced. There is often overlap of skills between adjacent lines of support
and while a team may be responsible for a particular level of support, staff
within that team can have skills which allow them to perform a role that is more
Page 3 of 39
13.
14.
WITNO0680100
WITNO00680100
usually performed by the previous or next level of support. There were 4 lines
of support for the Horizon service.
1st line support was provided by a number of teams, namely the Horizon
Service Desk (HSD Initially operated by Fujitsu, later moved to ATOS, I do not
remember the date when this happened), the Communications monitoring
team (CMT, also operated by Fujitsu) and the National Business Support
Centre (NBSC, operated by Post Office).
Post Office outlets would contact the Horizon Service Desk for issues relating
to the Horizon application or the hardware provided in branch by Fujitsu to run
the Horizon application (The HSD has also been known as the HSH, Horizon
System Helpdesk and the Horizon Incident Team). HSD staff dealt with
enquiries such as:
14.1. Helping sub-postmasters with the operation of the Horizon hardware,
scheduling engineers to attend branches to investigate reports of
hardware issues.
14.2. Helping sub-postmasters with the operation of the Horizon application.
14.3. Monitoring the live estate and taking corrective actions defined in
knowledge documents.
Page 4 of 39
15.
16.
17.
WITNO0680100
WITNO00680100
1st line Communications Management Team operated by Fujitsu which
specifically focused on communication / network incidents, both within branch
and between the branch and the Horizon data centres.
National Business Support Centre, ‘1st line help desk for business / operational
issues operated by the Post Office. I am unable to expand further having never
seen this 1st line environment.
2nd line support was provided by the SMC (System Management Centre). The
SMC’s responsibilities included:
17.1. Searching knowledge articles based on the descriptions of issues
reported by branches, gathering evidence and applying simple, well-
defined work-arounds (often on the phone). An example of this would
be resetting passwords.
17.2. Supporting the Tivoli infrastructure which distributed the Horizon
application to the counters.
17.3. Reporting on events (alerts) generated by outlet and data centre
systems. Generation of incidents based on these events.
17.4. Operational Business Change (OBC), supporting the engineers who
were opening and closing branches and increasing and decreasing the
number of counters in branches.
Page 5 of 39
18.
WITNO0680100
WITNO00680100
3rd line application support was provided by the SSC (System / Software
Support Centre). The SSC’s role is defined in detail in POL00000912 (Legacy
Horizon) and FUJ00080234 (Horizon online). This is a précis. SSC staff
provided 3rd line application support and had a detailed knowledge of the
Horizon application, they:
18.1.
18.2.
18.3.
18.4.
18.5.
Applied analytical skills to the symptoms and evidence gathered by the
1st and 2nd line functions and undertook in-depth investigation into
incidents.
Designed, tested and documented work rounds for the 1st and 2nd
lines of support.
Investigated and resolved new Software Incidents. Undertook source
code examination, complex diagnosis and documentation of new
application problems before sending them to the 4th line support group
for root cause software fixes. This would include the design and
documentation of work rounds to mitigate impact to service.
Undertook complex configuration (configuration items can be used to
alter the behaviour of the application) and data fixes which might have
required the generation of special tooling.
Designed, wrote and documented new support tools. This included the
development and maintenance of Peak and the SSC Web (which
contained the KEL) systems.
Page 6 of 39
19.
20.
WITNO0680100
WITNO00680100
18.6. Provided technical support to other internal Pathway / POA teams
working on Horizon. For example, Horizon Problem Managers,
Reference Data Management, Security Operations, Release
Management Forum.
4th line support staff had an intimate knowledge of narrow areas of the system
and were ultimately responsible for the production of permanent fixes to repair
the root cause of an incident or problem in the live application. They had
knowledge of computer languages and development methodologies which they
used to fix problems in the live application code. There was often overlap
between 4th line and development, who added new features into the
application.
There were other teams providing support services whose roles did not fit
neatly into this 4 layer model. These included:
20.1. Security Operations. Responsible for the Reconciliation Process.
Business Incident Management Service (BIMS) entries. I believe the
functions of another team (Management Support Unit - MSU) were
subsumed into Security Operations (can’t remember when) so I’m
using the name Security Operations in this document to indicate either.
20.2. Belfast Operations. Operation of the Data Centre systems and the
support of the operating systems running on them (e.g. Windows,
Oracle)
Page 7 of 39
21.
WITNO0680100
WITNO00680100
20.3. Reference Data Management. The team who tested and processed
and ensured the delivery of, reference (AKA configuration) data. This
team was merged into the SSC in approx 2010.
I have been asked about the relationship between the support teams within
Fujitsu. The relationship between support groups was generally good.
Secondments were arranged between units, e.g. 2nd line staff working with 3rd
line, 3rd line working with testing or development to foster co-operation and
understanding of each others roles.
The SSC
22.
23.
24.
The SSC operated with various structures and numbers of staff over the 22
years I was involved:
During the legacy Horizon period there were between 20 and 30 members of
staff in the SSC. SSC staff members would generally be referred to as
diagnosticians or technicians, the two terms being interchangeable. The
original SSC manager (Mik Peach) ran the SSC as a flat structure with all staff
reporting directly to him.
Later when I took over as SSC manager (April 2010) I split the SSC into 3
teams consisting of a team lead with 6-8 members of staff reporting to them.
These teams were purely administrative. The reference data team was also
merged into the SSC at approximately this time.
Page 8 of 39
25.
26.
27.
WITNO0680100
WITNO00680100
In approx 2014 my role was expanded to include the support of three other
customers and three additional support teams came under my remit, the result
being a total of six teams and some 40 staff. Changes in workload had left
support teams dedicated to a particular customer under or over resourced
(Horizon support was one of the areas identified at the time as being over
resourced). Expanding the SSC in this way allowed more resource sharing
(people and tooling) hence the SSC became known as “shared service” unit.
Removing some team demarkation and cross training staff allowed an
individual to support more than one customer. This improved workload
resourcing and the retention of experienced staff by providing a varied and
more interesting workload (particularly true for Horizon support staff). This type
of sharing would also allow support tools (such as the SSC website) to be
utilised in the support of more than one customer rather the'reinventing the
wheel for each customer. From necessity, my role became more strategic
and I had less involvement in the day to day operation of the support service,
this being covered by my team leads. For the purposes of this document I am
only describing the facets of the SSC relevant to Horizon.
Over the life of the SSC staff would move on to other roles inside our outside
Fujitsu. Such changes are normal and may cause short term resourcing issues
while new staff and recruited and trained. At no time did I consider the SSC to
be under resourced to the detriment of any of the customers we supported.
SSC staff received formal training on the technologies used in the applications
they supported. For the Horizon application this included Microsoft Visual
Basic, Riposte, Java, Oracle databases and SQL server database. Because
Page 9 of 39
28.
29.
WITNO0680100
WITNO00680100
the Horizon application was bespoke, designed and developed to Post Office
requirements, Horizon application training would be delivered to the SSC by
the development teams as and when new facilities were introduced. This
process was often referred to as “knowledge transfer". SSC diagnosticians
would also be expected to self train by examining design documentation and
support guides produced as part of the Horizon development process.
Turnover of staff within the SSC was quite low. When replacement or
additional staff were needed preference would be given to people within other
Fujitsu departments with a relevant technical background. If such people were
not available a standard CV / interview process would be followed to recruit
externally. Any successful applicants working on Horizon were subject to
security vetting and approval of the Security Operations team. There were no
academic criteria applied to the recruitment process, selection criteria were
technical ability, being based on a combination of:
28.1. Previous experience within a support environment
28.2. Knowledge of the core technologies used for the application being
supported.
I have been asked about the role of SSC Manager: This was a wide role
encompassing the day to day operational management of the SSC, staff
welfare, development and strategic direction for the Horizon support function.
The SSC manager's responsibilities included:
Page 10 of 39
WITNO0680100
WITNO00680100
29.1. Staff welfare
29.2. Staff career development. Regular appraisal of staff.
29.3. Day to day resourcing.
29.4. Problem management.
29.5. Workload prioritisation.
29.6. Support service reporting.
29.7. Support service analysis and improvement.
29.8. Interface to other departments.
29.9. Representing support in the software release process.
29.10.Authorisation for the production of new support tooling.
29.11.Authorisation of operational changes (OCRs and OCPs).
29.12.Generation / amendment of work instructions.
30. AsIhave mentioned before, the SSC did not have a formal role called “deputy
manager” while Mik Peach managed the unit but there was a requirement for a
stand in for the SSC manager to make the day to day decisions required to
Page 11 of 39
31.
32.
33.
WITNO0680100
WITNO00680100
keep the SSC running in the managers absence. This was the role (in addition
to my support role) I fulfilled during the time when Mik Peach was the SSC
manager.
The vast majority of the Horizon work into the SSC was recorded as Peak
incidents. Other “ad-hoc” tasks could originate from problem managers or
other departments within Pathway. Sometimes a person (e.g. Problem
Manager) would request work directly from their favourite SSC diagnostician
but this was discouraged.
The SSC administrator (Barbara Longley and later Lorraine Elliott) would
assess each Peak as it arrived and allocate it to members of the SSC based on
their skills and current workload. This may also include a revision to the priority.
The SSC administrator role was not technical. The SSC manager allocated any
requests for other work not recorded on Peak.
In approximately 2010 (I cannot remember the exact date) this method of
allocation changed. The workload of the SSC administrator had decreased
over time and the account economised by removing the role. A daily rota of
SSC diagnosticians was established, known as the “Prescan Rota”. The
diagnostician on Prescan would assess each new Peak incident, immediately
responding to those which required little work or allocating the incident to
another member of the SSC, again based on their skills and current workload.
The “Duty Manager Rota” was also established, staffed by SSC team leaders.
This role processed operational issues: accepting and allocating ad-hoc
Page 12 of 39
34.
WITNO0680100
WITNO00680100
requests, sign off operational changes. Neither of these changes had any
adverse effect on the Horizon support service.
Incident priority was initially allocated by the originating team or service. After
a technical evaluation was completed the priority may be amended by the SSC
if the initial value was inappropriate. There was guidance on the priority for an
incident in the “End to End Support Strategy” document (FUJ00080212) but is
was essentially determined by and evaluation of:
34.1. Impact to user / service
34.2. Number of users / systems affected
SSC Website
35.
36.
The SSC developed and supported an internal (to Fujitsu) website to store and
allow the rapid retrieval of, support knowledge, operational change details and
general information for the Horizon support community. This has been
variously known as the SSC Intranet or SSC Web. The SSC Web was
developed and improved over the life of Horizon and was the main support
knowledge base for the Horizon system.
One type of knowledge entry held within the SSC Web was the KEL (Known
Error Log): KELs record support knowledge which is intended to assist staff in
the support and understanding of the Horizon system. KELs could be created
and updated by Horizon support, test and development. There was one
Page 13 of 39
37.
38.
39.
40.
WITNO0680100
WITNO00680100
exception, the 1st line help desk function do not create KELs (HSH 1st line
used their own knowledge base).
While each KEL was constantly updated to provide the best current technical
information, they did not contain the history of an incident. This was
documented on the Peak (AKA PINICL system) system.
KELs were generated for a number of reasons while I worked on Horizon, for
example: to explain system behaviour or messages that originate from central
and counter systems; to record actions that technicians may take to determine
the reason for a system behaviour or gather relevant evidence to aid
understanding; to provide guidance on which document to read to understand
a particular aspect of the system; to record symptoms and outcomes from
incidents referred by other support units; to record support information on
issues seen in test environments.
The acronym KEL is a misnomer inherited from a previous system. KEL entries
were support knowledge entries and did not have a one to one relationship with
errors on the system. There were a more KELs which contained technical
information designed to assist in the understanding of the system than KELs
relating to specific application errors.
When attempting to resolve an operational issue or a reported incident the
diagnostician would use the text searching facilities of the SSC Web. The
diagnostician would use their experience to identify keywords to describe
Page 14 of 39
WITNO0680100
WITNO00680100
whatever is being investigated and then use these words to define search
criteria.
41. After being presented with search criteria, the SSC Web would examine the
knowledge base and return to the diagnostician summary entries from
documents, work instructions and KELs containing information matching the
search terms. The diagnostician would then examine these summary entries in
detail to ascertain relevance to the problem being worked on.
42. The textual search function was invaluable in reducing the large volume of
information held within the SSC Web to a small subset that was of use to the
diagnostician seeking information on a particular subject.
Operational Change
43. The SSC Website also contained the operational change platform. Operational
change documents were used to record the detail of operational changes and
provided a vehicle for the assessment of their potential risk / impact and
approval to proceed.
44. Documents were called OCPs and OCRs. One allowed the SSC to record
minor changes that only required SSC manager approval, the other was for
changes with wider impact that required the notification and approval of
multiple teams. Examples of the types of changes OCP / OCRs were used for
include: configuration changes, system reboots and hardware replacements. I
cannot recall all the types of change that were recorded on OCP / OCRs or the
Page 15 of 39
45.
46.
Peak
47.
WITNO0680100
WITNO00680100
detailed content and scope of any data corrections. More clarity for the inquiry
could be obtained from Fujitsu.
Each team would assess the change described and document on the OCP /
OCR:
45.1. Potential risk / impact to the teams area of responsibility.
45.2. Scheduling of resources required of their team to implement to change.
45.3. Formal approval from team to proceed with change.
The SSC manager (or delegate) would approve OCPs / OCRs on behalf of the
SSC.
Peak was a web based software incident and problem management system
used by Post Office Account for all development, test and support teams
except the ‘st line help desk. It enabled details of the incident and diagnostic
progress to be captured in a searchable format and allowed the tracking of
problems from detection through to resolution. Peak was developed in-house
by the SSC from the PinICL system it replaced in 2003. The system was
customised and enhanced by the SSC during the whole period of my
involvement with Horizon support. John Simpkins was the main designer and
developer of this system while I was SSC manager. I understand from him that
Page 16 of 39
WITNO0680100
WITNO00680100
this system is still in use. Peak was bespoke, it was adapted as and when
requirements changed for Horizon incident and problem management. This
made a Peak an excellent tool to manage Horizon incidents.
Support Process
48.
49.
50.
The chain of support teams and the support process for resolution of an
incident is described in FUJ00080212 (End to End Support Strategy), a
document written by myself in 2011 which was itself derived from
FUJ00079897 (End to End Support Process Operational Level Agreement)
written by Mik Peach in 1999 (amended 2003) for Legacy Horizon. I have
been specifically asked to include the support process in my witness statement
so have produced a short form here.
For most of its life cycle an incident was assigned to a particular support team
and a person within that team who was responsible for the next action on the
incident. As the incident was progressed by various members of the support
community, they added textual comments and supporting evidence to the
incident record (Peak). These comments charted the progress made in
resolving an issue and would vary in fullness and clarity.
I will describe what happened when an incident arrived when Legacy Horizon
was live. Prior to the establishment of a Prescan function, the SSC
administrator checked the basic details logged to the incident and assigned the
incident to a diagnostician with appropriate skills. That diagnostician would do
Page 17 of 39
51.
52.
WITNO0680100
WITNO00680100
a technical analysis which might result in passing the incident (with agreement)
to another member of the team with more appropriate skills.
I will now consider what happened once the prescan function had been
implemented. The prescan diagnostician used their technical knowledge for a
basic assessment of the incident. This may have resulted in an immediate
response in situations where the incident was known (e.g. subject to a KEL or
support guide information) or where there was inadequate information logged
(e.g. basic details missing such as a FAD code) for the SSC to progress the
incident. If no immediate response was possible, the incident was assigned to
a diagnostician with appropriate skills for further analysis.
The diagnostician used their technical knowledge and expertise with the
Horizon application to examine and resolve incidents. They would also
examine various sources of additional information such as:
52.1. Viewing logs (log files record any significant action or occurrence that's
recognised by the software system).
52.2. Accessing Horizon systems
52.3. Searching the SSC website
52.4. Searching Peak (for similar incidents)
52.5. Talking to the person who reported the fault
Page 18 of 39
53.
54.
55.
56.
57.
WITNO0680100
WITNO00680100
52.6. Discussing the incident with colleagues, e.g. other diagnosticians,
developers, design authorities
Relevant information and evidence from these sources would be added to the
Peak incident as it was gathered.
If the diagnostician believed that the incident represented a fault in the
application they may examine design documentation (sometimes a perceived
fault is actually a requirement of the system design) and source code (SSC had
access to all application source code) to determine the root cause.
In the vast majority of cases this process would result in the resolution of the
incident by the SSC. The SSC diagnostician would inform the originator of the
incident and / or organisation contact, such as Post Office via Fujitsu Service
Management, and then apply a final response code along with summary text
that supported the response code to close the incident.
Final response codes were used to classify the outcome of an incident and
were the subjective opinion of the person closing the incident. They were
useful to assess the performance of support units.
The 2nd line support groups were expected to answer any incidents within their
operating remit (for example all user or known errors). They were also
expected to send only one example of a suspected new software fault to 3rd
line, retaining any duplicates at 2nd line for closure once the main incident was
resolved. Because of this, any answers from 3rd line with response codes
Page 19 of 39
58.
59.
60.
WITNO0680100
WITNO00680100
such as User Error, Published Known Error or Duplicate call would be classed
as "black marks" and counted against 2nd line support (similar measures
existed between 3rd and 4th line). In the SSC these measures would be
reviewed on a monthly basic to assess the effectiveness of the service. I
believe similar reviews look place in other departments.
The 1st and 2nd line groups were effective responding to incidents, this being
reflected in the volume of incidents sent on to the SSC which represented a
single digit percentage of the incidents originally received by 1st / 2nd line.
This does not imply that all incidents sent to the SSC were suspected
application errors. Incidents would also be sent to the SSC where the
originating unit did not have the skills, tools or system access required to
progress the problem.
The use of response codes as a measure would sometimes cause discussion
between levels of support staff ("why did you close this as a known issue when
we couldn't see the document", "why no fault in product when we don't have
access to xxxxxxxx data which was essential"). These minor complaints would
be resolved individually.
The use of response codes as a measure of support effectiveness could also
lead to inappropriate response codes being used in order to “be kind” to, or
prevent contention with, other lines of support. For example, “Advice after
investigation” being used in preference to “No fault in product” or “Advice and
guidance given”.
Page 20 of 39
61.
62.
63.
64.
65.
66.
WITNO0680100
WITNO00680100
If the SSC diagnosticians’ investigation determined that the incident
represented a fault outside the purview of the SSC the incident would be sent
on to the appropriate team. For example, server operating systems issues (to
Belfast Operations team) or event management problems (to Management
Systems Support team)
If the SSC diagnostician determined that an application fix was required the
incident would be onward routed to 4th line. A KEL would be raised / updated
by the SSC with details of the issue. This ensured the visibility of the issue to
other support groups.
Anew problem would be discussed with the relevant business owner and the
relative importance, impact and priority would be assessed (part of the Release
Management function).
4th line were responsible for designing and coding any fixes required to the
Horizon system. They were part of the development group and had their own
detailed process and procedures which I am not able to expand on.
Once a suitable fix had been written it would be delivered to a test system for
functional and regression testing. There may be an iterative process between
4th line and test as the fix was refined.
Once the test team had signed off the fix as being fit for purpose, it again
become subject to the Release Management process, which delivered the
change into the Horizon estate.
Page 21 of 39
67.
68.
69.
70.
WITNO0680100
WITNO00680100
There was never any pressure applied to the SSC to hide application errors.
The opposite was true. The SSC would push for the resolution of errors in
order to improve Horizon and reduce incident workload being passed through
the system. The SSC provided details of identified bugs errors and defects via
the Service Management Team within Fujitsu and not directly to sub
postmasters or the Post Office.
I now consider the mitigation of operational problems and application errors.
When the root causes of problems were identified, the SSC would check the
Horizon system for the fingerprint left by the problem and identify which outlets
were impacted. If the impact was financial the SSC would also quantify that
financial impact. I have been asked to explain this in more detail which is best
achieved by a fictitious example: Investigation of an incident identifies that an
application error results in the recording of two stamp sales when the sale of a
first class stamp happens immediately before a withdrawal of exactly £55 in
cash when another 1st class stamp sale was cancelled in the same basket of
transactions. Once the cause and effect are understood in this detail, the SSC.
could construct one of more queries, across transactions from all the counters in
the Post office estate, to identify which offices exhibited exactly the same set of
circumstances.
This information would then be collated for reporting to the Post Office by
Fujitsu's Service Delivery team or Security Operations. While not my area, I
have a basic understanding of how it worked:
Page 22 of 39
71.
72.
WITNO0680100
WITNO00680100
70.1. For minor issues, the information would usually be provided to Post
Office by email
70.2. For major issues, it would be provided in a Major Incident Report or
something similar.
70.3. Information may also be passed to Post Office via the Business
Incident Management Service (BIMS)
As I understand it, there were a number of ways in which Post Office could take
corrective action based on this information and how it choose to do this
depended on the nature of the issue. One way was by issuing a Transaction
Correction to restore the branch to the correct position.
The SSC was hugely reluctant to change transaction data as that was not our
job and we recognised the seriousness of doing so. In the rare circumstances
when it was necessary to correct financial information on the system we would:
72.1. Ensure that the reason for change and content of the change was
approved, normally via an Operational Correction Request (OCR)
72.2. Ensure that changes were attributable to the support group by
annotation within the changed information to ensure it was visible in the
audit trail.
Page 23 of 39
WITNO0680100
WITNO00680100
72.3. Ensure that the content and execution of the change was witnessed by
asecond person.
72.4. Ensure POL and/ or the sub-postmasters were informed (again via the
Service Delivery Team).
SLAs
73. The SSC had no direct service level agreements (SLAs) or penalties (but see
74 below) relating to support incidents. The SSC did work to targets based on
the priority assigned to a particular incident and the final response codes.
Measures against these targets being used to determine the effectiveness of
the SSC (and other support units).
74. Other services did have SLAs and penalties. The same level of diligence was
applied by the SSC to all incidents, whether an SLA was relevant or not. The
possibility of financial penalties was never a factor for the SSC. Particular
memorable SLAs to me are:
74.1. SLAs for business incidents (owned by Security Operations) were
relevant when the SSC was providing technical support to Security
Operations. Business incidents (BIMS) were always treated with the
highest priority within the SSC.
Page 24 of 39
WITNO0680100
WITNO00680100
74.2. SLAs for delivery of transactional data (I think resulted in penalties
against the data centre operations service). Again, the SSC provided
support here and incidents were treated with appropriate priority.
Support Tools
75. Various tools were available to the SSC to aid support of the Horizon system.
Some that I remember are:
75.1.
75.2.
75.3.
Smiley support tool written by John Simpkins (SSC), which
amalgamated information from various sources (e.g. databases) into a
single view pertinent to a particular support task and provided a unified
interface to run various tools to achieve a single support outcome.
A Legacy Horizon tool (I cannot remember its name) written by Richard
Coleman (ex SSC) whose function was to retrieve messages (i.e. data)
from the Correspondence Server to local text files for examination and
which was eventually subsumed into the Smiley support tool.
HORIce (Horizon Information Centre): A web based tool that eventually
replaced Smiley for Horizon Online. Like Smiley, used to present read
only views of database information (BRDB, APS, TPS etc) and the
amalgamation of various data sets to present information to the
diagnostician. Because it was Web based it allowed information to be
made directly available to all Fujitsu support groups and even Post
Office help desks. HORIce users expanded over time so I cannot
Page 25 of 39
WITNO0680100
WITNO00680100
define exactly who had access and when. Fujitsu may be able to
provide a timeline by examining the users and when they were
introduced.
75.4. TIP Repair Tool: Used for support work on the interface files sent from
Horizon to Post Office (Chesterfield).
75.5. Audit Information: The SSC could make audit retrieval requests via the
security team (known as ARQ requests, I can’t remember the meaning
of the acronym) to examine system information outside the window that
was directly available online from Horizon systems (3-6 months).
Remote Access
76. Acomputer system with geographically separated components needs to
support remove access to those component systems. This remote access
allows suitably trained staff to maintain the system and assist the users of that
system from a distance. This support requirement has to be balanced with the
necessity of keeping the system secured, ensuring that only authorised
persons have access and maintaining a record of any actions taken.
77. As the Horizon system was developed and used the understanding of support
and security requirements evolved. It was common for the security and
support staff to discuss both requirements (support vs security) and agree on
how the access rights, audit trails and security of the system should change.
Page 26 of 39
78.
WITNO0680100
WITNO00680100
There were five teams I remember having remote access to the Horizon
system which I have described below. I do not know what system components
(files, databases, network shares) or access level (read, write etc) each team
had once remote access has been achieved:
78.1. SMC: Access to counters and servers via a restricted Tivoli toolset (mini
applications designed to return specific information or effect a carefully
defined and restricted change). Used to support software distribution
issues.
78.2. Belfast Operations staff (responsible for infrastructure and operating
systems support). Remote and local (i.e. physically in the data centre)
access to servers. Used for the support of hardware, operating systems
and data centre server applications. I don’t believe they had remote
access to counters.
78.3. SSC: Access to counters for Riposte and reference data support.
Access to data centre server applications (e.g. Oracle database), with
the exception of Audit systems, for application support.
78.4. Security Operations: Access to audit information via a restricted toolset.
Access for security assurance and audit data extraction.
78.5. Reference data team: Access to reference data definition (RDMC) and
delivery (RDDS) systems.
Page 27 of 39
79.
80.
WITNO0680100
WITNO00680100
SSC remote access to counter systems has never included the ability to use
the counter application seen by sub-postmasters (i.e. interact with counter
screen / keyboard).
All technical members of the SSC had the ability to remotely access Horizon
systems (This excluded the SSC administrator and Manager) under strict
security controls. Security controls for Legacy Horizon remote access
included:
80.1. Staff vetting. Carried out and reported on by the Security Team.
80.2. Terminals capable of remote access being held on a secure floor to
which only SSC staff had access (Other staff were signed in and
escorted).
80.3. Access roles required to enable remote access also required the use of
a physical security token in addition to username / password.
80.4. Computer terminals with a secured operating system build (separate to
standard corporate workstations).
80.5. Asecured and monitored network between SSC terminals and the data
centre.
80.6. The changes of system design implemented as Horizon Online made it
possible to relax some of these security controls (80.2, 80.4 above). I
Page 28 of 39
81.
82.
83.
WITNO0680100
WITNO00680100
do not have the detailed security background to explain why these
changes were possible but they would have only been allowed with the
agreement of the Security Architect and Security Team.
I have been asked to consider a document titled Secure Support System
Outline Design (FUJ00088036). In the early stages of Horizon the methods
used to remotely access data centre and counter systems could be described
as “needs must” in order to provide the support necessary that kept Horizon
running. This involved the use of a Microsoft tool “rclient’. While this tool
allowed remote access and command execution on Microsoft operating
systems (as used on Horizon counters and some data centre systems) it did
not provide the detailed level of accountability (e.g. detailed command logging)
required for Horizon. FUJ00088036 describes how the security of the system
was enhanced using Secure Shell (AKA SSH, OpenSSH).
As a result of implementing the changes described in FUJ00088036, support
access was improved while also providing enhanced levels of access security
and logging. I would expect that the rclient application was removed from the
system after these changes were implemented but cannot confirm that was the
case.
I cannot give the inquiry much technical detail on the usage once remote
access had been established to a counter. I was never a counter specialist but
in brief I do remember remote access being used to resolve:
Page 29 of 39
84.
WITNO0680100
WITNO00680100
83.1. Legacy Horizon only: Incidents affecting the replication of Riposte
messages between counters in the outlet, between single counter
outlet disks (master and slave) and outlet and data centre.
83.2. Incidents relating to service control parameters (reference data).
83.3. Incidents relating with the distribution of new software to the counters.
Remote access has always been essential to the maintenance and support of
Horizon counters and servers. In particular Legacy Horizon exhibited issues
that would require SSC diagnosticians re-play Riposte records into a suitable
Message Store or insert new control records. Note: I am using the terms
records (an entry within the Riposte Message Store) and transactions
(information contained within a record that pertains to an interaction ata
counter). To be clear, these SSC workarounds did not involve the construction
or amendment of transactions. SSC would be re-playing records that had
already been committed to a Message Store but that for some reason, were
not in the correct place (i.e missing from one Message Store but present in a
replicated copy). It is also worth mentioning here that the Riposte system did
not allow any editing or deletion of records in the Message Store once written.
84.1. Some issues required that the SSC insert Message Store records that
controlled the system state (e.g. Login / logout) or the system
configuration (reference data). In most cases these records would be
inserted into a Message Store at the data centre so that they would be
replicated down to the outlet counters next time the outlet connected to
Page 30 of 39
85.
84.2.
WITNO0680100
WITNO00680100
the data centre, effecting whatever state change was required at the
outlet.
Remote counter access would be used when Message Store
intervention required that the records being re-inserted originated from
the outlet counter. For context, records within the Riposte message
store included details of the originating FAD code and counter ID.
Some types of records (normally transactions) could only be accepted
by the system if they originated from an ID within the outlet.
One would have to concede that where the SSC used Riposte tools and
remote access to have a positive effect on outlet information, the opposite must
also be possible. If an SSC diagnostician made errors when re-playing
message store transactions then a discrepancy could result. Controls offered
some protection here:
85.1.
85.2.
85.3.
The system enforced rules which prevented duplicate or erroneous
records being written.
Any such intervention would be with the sub-postmasters consent and
the sub-postmaster would use system reporting to check that the
results of SSC work were as expected.
SSC staff were competent in these areas (or when someone new was
training they would be closely supervised).
Page 31 of 39
86.
87.
88.
89.
90.
WITNO0680100
WITNO00680100
Unauthorised / malicious use of these tools by a member of the SSC was
possible but I cannot see the motivation for this. There would be no financial
incentive without collusion with the sub-postmaster, who could enter the same
type of transactions anyway without requiring SSC assistance. I do not
remember any examples of unauthorised or malicious use of remote access
while I was working with Horizon.
Horizon Online, by virtue of its design (no transaction data stored remotely),
reduced the use of remote access to counters. There were tools which allowed
authorised users audited access to insert corrections to the Branch Database
but I never used them and do not remember the details of them.
I believe audit information was held in respect of remote access but I cannot
remember exactly what was collected or how it was collected.
I do not know who in the Post Office was aware of the remote access used by
the support teams.
I have been asked to consider an email chain on 25th June 2015
(FUJ00087151) and in particular the comment contained within that “Access
from terminal server to counter is not audited”. Unfortunately I do not
remember this meeting but after reading the email I can say: The email
documents the security of Horizon counters (Horizon Legacy and Horizon
Online) within branch. I think it was intended to illustrate just how impractical
unauthorised remote access would be. The “Access from.....” comment
describes the fact that there was no audit trail in Horizon Online which
Page 32 of 39
WITNO0680100
WITNO00680100
documented when a network connection was made from a terminal server in
the Horizon data centre (AKA SSN server) to a branch counter.
Bugs, errors and defects
91.
I have been asked to comment on a number of bugs, errors or defects
identified in Appendix 2 of Bates and others v. Post Office Limited (No. 6)
“Horizon Issues”. Unfortunately, with the passage of time, I have no
recollection of the incidents quoted. Even with access to contemporary notes
and documents I do not feel I would now be able to produce something useful
to the inquiry. The detailed technical knowledge required is a perishable skill.
The most effective way for the inquiry to get further clarity on these issues
would be via Fujitsu technicians still involved with the system analysing the
contemporary documents and reporting on each incident.
Reconciliation Service
92.
93.
Day to day execution of the service and reporting were the responsibility of the
MSU / Security Operations team. If I remember correctly the MSU were
merged into the Security Operations team (not sure when) so one may find
either name being used in documents.
SSC involvement with the reconciliation service was limited to the provision of
technical support. Examples being:
Page 33 of 39
WITNO0680100
WITNO00680100
93.1. Resolution of incidents preventing the provision of the service such as
failures in the production of regular reporting.
93.2. Examining the live service to provide information to Security
Operations.
94. Asa problem manager I was very aware that any incidents relating to the
reconciliation service were to be treated as a high priority (due to SLAs
impacting Security Operations) and ensure they were scheduled accordingly.
As a technician I do not remember the details of any incidents of this sort.
95. Service reporting and analysis were the responsibility of the Security
Operations team so I am unable to comment on the effectiveness of this
service.
96. The BIMS system was administered by the Security Operations team (SSC
had no access) so I can offer no further detail on its operation.
Release Management Service
97. The Release Management team was responsible for the Release Management
Service, which managed the scheduling of fixes and the delivery of new
application modules to all Horizon systems. Regular meetings (the Release
Management Forum, RMF), attended by the SSC, allowed for the discussion
and dissemination of, release information:
Page 34 of 39
Audit
98.
WITNO0680100
WITNO00680100
97.1. Discussion of the relative importance, impact and priority of new fixes
or new functionality.
97.2. Reporting the progress of fixes and new releases (containing additional
features and bug fixes) through development and test teams.
97.3. Reported on the extent to which a new release had been delivered to
the server and counter estate. New software could take many days to
be delivered and implemented across all counters.
Post Office obtained data for prosecutions from audit via the Security Team
(ARQ requests). The gathering and storage of audit data was not supported by
the SSC (it was supported by development). This was a deliberate security
policy so that people supporting the system did not have direct access to audit
information. SSC would be consulted for technical explanations of some data.
In particular SSC would check system event messages retrieved as part of the
ARQ and comment on any that could indicate an impact to financial data. I do
not remember the content or format of the data returned from ARQ requests.
Because the SSC did not support audit I am also unable to give the inquiry any
help with the methods used to gather audit information or details of the
information retained.
Robustness of Horizon
Page 35 of 39
WITNO0680100
WITNO00680100
99. Ihave no experience of any other application system of comparable size and
complexity on which to base a comparative judgement on the robustness of
Horizon. I can say:
100. During the early years of Legacy Horizon there was a great deal of support
work. Staff worked long hours and in particular Wednesday evenings were
always busy as SSC staff were helping sub-postmasters with their cash
accounts / rollovers. I don't consider this to be an indication of a lack of
robustness, in the early days support staff were getting used to a new system
and as the national rollout progressed, new sub-postmasters were being
introduced each week who also had to get used to the system.
101. Ialso noticed a change in supportability between Legacy Horizon and Horizon
Online:
101.1.Legacy Horizon logged all transactions locally and only communicated
with the data centre intermittently. This localised design was necessary
when computer networking was in its infancy but could present issues
to the integrity of transaction data if not correctly managed. Risk was
mitigated by replicating data between counters or multiple disk drives to
provide multiple copies of information. This design did increase the
amount of intervention by required by support groups to ensure
transactions were visible to the system in the correct place and at the
correct time. This work did not involve the construction of transactions.
Page 36 of 39
WITNO0680100
WITNO00680100
101.2. The improved availability, speed and reliability of network connections
allowed Horizon to go totally online (Horizon Online), all transactions
were processed in the data centre. This design change improved the
supportability of the system and reduced the amount of intervention
required from support staff.
Advice and assistance
102. I have been asked specifically to comment on the sub-postmasters access to
adequate advice and assistance. The majority of advice and guidance was
provided by the Post Office (e.g. NBSC, branch visits) and 1st line support
(HSH). Since I had no direct involvement I cannot help the inquiry with these
areas. In the cases when the SSC contacted sub-postmasters directly, I
believe that all required assistance was given.
SSC involvement with prosecutions
103. SSC had very little involvement with prosecutions. This changed briefly when
Anne Chambers was persuaded to write a witness statement because she had
provided some assistance with a particular incident. She subsequently also
made a court appearance as a witness. I remember that she found this
stressful and her experience made people in 3rd line think twice about
providing support for certain kinds of issues. As a result of this, Gareth Jenkins
(Horizon architect) was nominated as, for want of a better term, “court
representative” and the SSC’s role was limited to fulfilling his requests for
Page 37 of 39
WITNO0680100
WITNO0680100
information from the live system (Gareth, as part of the architectural team had
no live service access).
Statement of Truth
I believe the content of this statement to be true.
URN Document Description Control Number
POL00000912 I CS Support Services Operations VIS00001926
Manual
FUJ00080234 I Horizon Online 3rd Line POINQO086405F
Application Support Service:
Service Description
FUJ00080212 I Fujitsu "End to End Application POINQ0086383F
Support Strategy", version 1.0
Page 38 of 39
WITNO0680100
WITN00680100
FUJ00079897 I Fujitsu Services End to End POINQO086068F
Support Process, Operational
Level Agreement, Version 2.0
FUJ00088036 I Fujitsu Services: Secure Support
System Outline Design v1.0 POINQ0094207F
FUJ00087151 I Email from Pete Newsome to POINQ0093322F
Harvey Michael and Gavin Bell
re: FW: 3 scenario demo
Page 39 of 39